Olexandr Vilkul holds field meeting of operative headquarters on the Danube in the areas of possible underflooding
In Odessa the
Vice Prime Minister Olexandr Vilkul held a field meeting to discuss preparing
to floods.
Taking into
account the sharp temperature rise it is possible forming of spring floods. On the
preliminary estimates Ismail, Kylyi and Reni areas
can suffer from underflooding in Odessa region and
there are 12 inhabited localities with over 10 thousand people, four sea ports
and around 120 kilometers of roads.
The Vice
Prime Minister set a task to subdivisions of the State Emergency Service and
Odessa regional state administration to intensify monitoring of the water level
in the Danube aiming to ensure predictability of the hydrological situation on the
Ukrainian section of the river. Moreover, to stir up carrying
of immediate works on hydraulic facilities. To place lookout stations on
most dangerous places where there exists the treat of dike burst and other
hydro-technical utilities.
At the meeting
Olexandr Vilkul commission the Interdepartmental headquarters to organize
interaction with respective bodies of Romania concerning mutual informing about
the situation in the Danube basin. If needed a well-balanced artificial regulation
of water levels in the Danube river will be ensured and underflooding
on the territories of Ismail, Kylyi and Reni areas
prevented.